Phase 1: Setting the Stage • DoubleMCX 2110 Bridge Dashboard
This document defines the functional and architectural requirements of the facility and is sometimes included as part of the initial System Proposal or Contract package prepared by Marketing/Sales.
The Program Document must be formally submitted to the client for review, comment, and written sign-off before detailed engineering design begins.
| Aspect | Traditional SDI Impact | ST 2110 Impact |
|---|---|---|
| Room Layout & Cable Pathways | Moderate | Critical – Affects PTP timing domains and latency |
| HVAC & Cooling | Important | Very High – “Thermal Tax” from high-density IP gear |
| Power & Grounding | Standard | Critical – Directly affects timing jitter and stability |
| Future Expansion | Nice-to-have | Essential – Leaf-spine fabrics are built for scale |
Client sign-off on this document helps prevent expensive redesigns later when facility constraints surface during detailed network, timing, and power engineering.